• Crawler Excavator With Sleeper Changer
  • Crawler Excavator With Sleeper Changer
  • Crawler Excavator With Sleeper Changer
  • Crawler Excavator With Sleeper Changer

Crawler Excavator With Sleeper Changer

Brand :JG

Product origin :FUJIAN

Delivery time :1Month

Supply capacity :yes

This small crawler excavator is specially designed for the replacement of railway sleepers. The average Each pillow changing machine can replace 1.5 pillows per minute, which greatly reduces the labor management cost and improves the operation safety.
The operating efficiency after using the Jingong railway pillow replacement machine can reach 20 manual workers.
Its grab can be customized according to the actual width of customer's local sleepers.

Excavator

This small crawler excavator is specially designed for the replacement of railway sleepers. The average Each pillow 

changing machine can replace 1.5 pillows per minute, which greatly reduces the labor management cost and improves

 the operation safety.

The operating efficiency after using the Jingong railway pillow replacement machine can reach 20 manual workers. 

Its grab can be customized according to the actual width of customer's local sleepers.

SPECIFICATIONS
RANGE OF OPERATIONBoom length3300mm
Arm length1850mm
Maimum digging force45KN
Back-end radius of gyration1800mm
Max. Opening Width of Grab650mm
Min. Opening Width of Grab200mm
Max. Radius Grabing Weight0.5~0.6t
Max,Width of Grab2800mm(customizable)
Grapple rotation angle360°
DIMENSION(Length*width*height) travel position6100*2800*2650mm
Gauge base2600mm
Track Gauge1570mm
Width Of Crawler400mm
Ground clearance of counterweight780mm
Min ground clearance280mm
TECHNICAL PARAMETERSApplicable railway gauge1435mm(customizable)
efficiency≥40pic/h
Angle of rotation360°
Machine weight8000kg
Engine modelYUCHAI
Rated Power48KW
Rated Speed2200r/min
Hydraulic system working pressure21Mpa
Hydraulic system flow120L/min
Metering gear pump2*28ml/r
Max Hauling force45KN
(High speed/low speed)4.5/2.5km/h
Grade Climbing ability70%/35°
Volume Of Bucket0.25m3
Revolution Overdrive Pressure16Mpa
Full circle swinging time5.5s
Fqt Fuel Quantity≥4L/h
Capacity Of The Fuel Tank110L
Hydraulic Tank Capacity110L











Should you have any questions concerning this product, pls contact Vicky Hong via sales@fjjgjx.com Mobile/WhatsApp:+8613799243565

harvester

Grapple Excavator

Excavator

harvester

Grapple Excavator

Excavator

harvester

Factory Show

Overview
Brand Strength
123rd Canton Fair
Team Service
JG OVERSEA SALES TEAM
Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy

close left right